Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Talk:Wave (Drayton Manor)

Discussion page of Wave (Drayton Manor)
Latest comment: 25 September 2013 by Lachlan5963

Just some stuff, going to rewrite this article soon.

  • 1992 - Shockwave is decided upon.
  • Winder 1992 - first concrete for Shockwave is layed
  • Concrete for Shockwave and Splash Canyon cost a million pounds
  • shockwave was built to the maximum height allowable under planning permissions
  • shockwave was ordered at IAAPA 1992 for delivery in Autumn 1992.
  • Drayton Manor didn't know Alton Towers and Blackpool were putting in rides for 1994.
  • The Zero-g roll had to be replaced.

Lachlan5963 (talk) 17:05, 25 September 2013 (UTC)Reply