Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Submission

Ride in the United Kingdom
Watch the on-ride POV
Submission
Alton Towers
Location Alton, Staffordshire, England, UK
Status Defunct
Operated 31 March 2001 to 2013
Statistics
Manufacturer Chance UK
Product Inverter
Capacity 48 per cycle (24 per side)
Height 15 metres
HELP

Submission was an Inverter built by UK manufacturer Chance UK that was previously located at Alton Towers in Alton, Staffordshire, England, UK. It operated from 31 March 2001 to 2013.

History

The ride first opened on 31 March 2001 on the spot previously occupied by Energizer. The attraction was situated in the X-Sector area, adjacent to Oblivion's brake run. It was removed after the 2013 season. The area where Submission stood was left open, and grass has been planted.[1]

References


Articles on Alton Towers